CASE STUDY: How a Leading Fitness Manufacturer Achieved 18-Month ROI with CodeFreeSpray

The Client: Titan Fitness Systems


The Problem: The "Automation Trap"

Titan Fitness initially looked at traditional industrial robots. However, they realized:

  1. Programming Costs: Hiring a full-time robotics engineer would cost $90,000/year.

  2. Downtime: It took 14 hours to program the spray path for a single new squat rack design.

  3. Wasted Material: Manual painters were using 25% more powder coating than necessary to ensure "full coverage."

The Solution: The CodeFreeSpray Series

Titan Fitness implemented the CodeFreeSpray Lead-Through Robot. Instead of hiring an engineer, they trained their head painter (with 15 years of experience) to "teach" the robot.

"I thought the robot would replace me. Instead, I taught the robot my technique in 10 minutes, and now it does the heavy lifting while I oversee the quality of three lines at once."Head Painter, Titan Fitness


The Results: By The Numbers

MetricBefore (Manual/Traditional)After (CodeFreeSpray)Improvement
Programming Time14+ Hours (Traditional)6 Minutes99% Faster
Coating Reject Rate12%< 0.5%Quality Surge
Paint Consumption$18,000 / month**$14,400 / month**20% Savings
Daily Throughput45 Units / Shift110 Units / Shift144% Increase

The Financial Impact (ROI Analysis)

By eliminating the need for a $90k/year programmer and saving $3,600 per month in paint waste, Titan Fitness reached the Break-Even Point (ROI) in exactly 15.5 months.

Year 2 Projected Savings: $115,000+ in pure operational profit.


Key Takeaways for Your Facility


Ready to write your own success story?

Contact our team atCodeFreeSpray.comfor a customized ROI projection for your factory.